Comply with local requirements for the grid connection of photovoltaic systems worldwide.
資料を請求する
Modern photovoltaic power plants and their single units (solar PV inverters) are able to support the electrical grid during both electrical faults in the system and also during normal operation. An independent verification of inverters and PV plants for electrical grid connection is often required by law, investors, operators, owners and the system operator. We offer such services of Grid Code Compliance (GCC) and we are accredited by the German accreditation body DAkkS, VDE FNN and by FGW. Certification according to BDEW 2008, Transmission Code 2007, FGW, IEC and international grid codes.